EV CHARGING
Preparing for a commercial charger site survey
Provide an overview from the road, a parking layout and an on-site contact who can grant access.
DT Car Philippines ·
Contact DT Car
Applying this to your decision
Mark the proposed spaces on a plan and keep uncertain dimensions clearly marked. The surveyor can then focus on the measurements that affect layout.
Before you commit
Let the survey team determine which measurements and technical checks must be taken on site.
What should a landowner prepare for an EV site enquiry?
Prepare a location pin, photographs from the road, proposed bays, layout and contact authorised to provide access for assessment.
Which location photos help assess vehicle access?
Photograph the entry from both directions, the turn into parking, the proposed bays and any barriers or height restrictions.
Who should attend an EV site survey?
Arrange attendance by the owner or authorised representative, the person controlling access and available building or facilities staff.
What drawings and access permissions should a site owner prepare?
Prepare a dimensioned layout where available, mark entry and exit, identify restricted areas and obtain site access permission before the visit.
What should I expect in the site survey deliverables?
Ask the project team whether the proposal includes a site report, layout, bill of materials and open issues. Confirm the agreed scope before scheduling.
What documents should a Philippine landlord prepare for an EV charging site survey?
Provide the site plan if available, location, access permission, parking photos and details of the representative authorised to assist the survey team.
Sources and further reading
Information checked · November 26, 2026
