Pasay, Metro Manila, Philippines
[email protected]•+63 906 018 5666
DT Car
Menu

EV CHARGING

Preparing a Philippine Property for an EV Site Survey

Help the property representative, technical team and leasing contact prepare for the same site visit.

DT Car Philippines ·
Field visit at a proposed charging location

Who needs to be available during the visit?

The person who approves a lease may not control the parking layout or utility records. Ask the site manager to identify the correct representatives in advance. Agree where the survey team can meet, who can grant access to restricted areas and what photography the property permits.

Which observations can a property owner prepare?

Photograph the proposed area from the road and from inside the parking lot. Note how deliveries, queueing vehicles and customers move at peak times. Record any known flooding and the extent of the affected area. Existing site plans or utility information can help a qualified professional evaluate the proposal. Leave electrical inspection to the authorised technical team.

What should be settled after the visit?

Request a written list of missing information, the contact responsible for each item and the next decision required. Separate the site survey, engineering assessment, internal approval and any commercial agreement when explaining progress to the owner. A survey appointment alone does not establish approval to build.

Your preparation checklist

  • Confirm the access, technical and leasing contacts.
  • Share current parking photos and known site restrictions.
  • Assign owners to questions raised during the survey.

Sources and further reading

Information checked · November 25, 2026

Take the next step

Landowners and authorized agents can propose a Philippine property to DT Car for V-Green screening. Metro Manila is the first priority. Send a map pin, parking layout, current photos and an owner or agent contact.

Email DT Car about a site →